Background
Mumbai Metropolitan Region Development Authority is contemplating to develop a master plan for integrated road development with the objective of strengthening and augmenting the existing road network particularly within the suburbs where intensity and demand for road traffic has been increasing significantly. As part of Master Plan it is intended to evolve efficient traffic dispersal system which will include provision of Elevated roads, Grade separators, Interchanges, ROB’s RUBs, subways, pedestrian vehicular underpasses, etc.
Salient Fetures
Name of the Project | Construction of Flyover at times of Burfiwala Junction, Andheri |
---|---|
Type of Project | Infrastructure Development Project |
Original Contract Value | Rs. 23.86Crores |
Revised Contract Value | Rs. 46.33 Crores |
Completion Date | Expected to be complete in all aspects by 26.01.2012 |
Original Overall Length of Flyover | 567.7 Meter |
Wearing Coat | 6 mm Mastic Asphalt as water Proofing course over deck slab + 50 mm DBM + 25mm Mastic Asphalt as Top Wearing surface. |